Numerous repair and maintenance works on tram tracks in Wrocław will be carried out using TINES® Polyrail materials for resilient rail fastening. TINES® products will be incorporated into various tasks, including the repair of the crossing at Plac Strzegomski, the intersection of Al. Armii Ludowej with ul. Krakowska, the replacement of turnouts, curves, and crossings at Plac Jana Pawła II, the repair of crossings through the tracks on Legnicka Street, the replacement of a turnout on Al. Gen. Hallera at the intersection with Grabiszyńska Street, and the construction of the western axis along National Road No. 94.
The investor is the Municipality of Wrocław.

Comprehensive construction solutions and ballastless track systems for railways, ensuring effective vibroacoustic insulation and a guarantee of durability for mainline tracks, engineering structures (bridges, viaducts, tunnels, and rail-road crossings).

A comprehensive offer of durable materials for the construction of tram tracks, allowing to reduce the level of vibrations and noise in the vicinity of the route.

A comprehensive offer of durable materials and construction solutions for subway track surfaces allows for the reduction of vibration and noise levels in tunnels.