As part of comprehensive works on ul. Świętego Mikołaja and Ruska Street, covering a section approximately 800 meters long, the track substructure and track surface will be replaced. For the execution of these tasks, the contractor will use TINES® Polyrail 50 resilient rail fastening material, TINES® Polyrail Primer as a primer, as well as MEGAdur EP 100 material for bonding concrete and steel elements. The works are being carried out for the Municipal Transport Company in Wrocław.

Comprehensive construction solutions and ballastless track systems for railways, ensuring effective vibroacoustic insulation and a guarantee of durability for mainline tracks, engineering structures (bridges, viaducts, tunnels, and rail-road crossings).

A comprehensive offer of durable materials for the construction of tram tracks, allowing to reduce the level of vibrations and noise in the vicinity of the route.

A comprehensive offer of durable materials and construction solutions for subway track surfaces allows for the reduction of vibration and noise levels in tunnels.