The integrated track-road surface system TINES® will be installed as part of the investment titled: “Construction and reconstruction of the tram route along Kasprzaka Street and Wolska Street” Task 2.
As part of the ongoing investment, prefabricated track-road slabs TINES® TRAM LC-L with a total length of 215.0 meters and inter-track slabs TINES® TRAM LC-LM with an area of 166.0 m2 will be installed. The contract with the General Contractor – STRABAG Sp. z o.o. provides for the delivery of a complete rail system in the casing TINES® TRAM ERS using the polyurethane pouring mass TINES® Polyrail 50.
The first slab deliveries have already arrived at the construction site.
Read also
Comprehensive construction solutions and ballastless track systems for railways, ensuring effective vibroacoustic insulation and a guarantee of durability for mainline tracks, engineering structures (bridges, viaducts, tunnels, and rail-road crossings).
A comprehensive offer of durable materials for the construction of tram tracks, allowing to reduce the level of vibrations and noise in the vicinity of the route.