TINES Rail will supply polyurethane ballast compound TINES® Polyrail 50 for resilient rail fastening for the project titled “Stage A, within the construction of the tram line to the Jar estate in Toruń, carried out in the section from Watzenrodego Street, Ugory, Polna, and Legionów from Strobanda Street to the railway-road crossing.” All deliveries, in accordance with the schedule, will be completed in 2022.
Read also
Comprehensive construction solutions and ballastless track systems for railways, ensuring effective vibroacoustic insulation and a guarantee of durability for mainline tracks, engineering structures (bridges, viaducts, tunnels, and rail-road crossings).
A comprehensive offer of durable materials for the construction of tram tracks, allowing to reduce the level of vibrations and noise in the vicinity of the route.